Landis finished the 54,000-square-foot addition to the existing St. Charles Parish Hospital in 2008. Each floor of the hospital was designed and constructed with a particular focus in mind. The first floor serves as a multi-faceted space housing the Cardiology Rehabilitation Center, the Courtyard Café, the chapel, the Outpatient Dialysis Unity, a Medical Office Suite, and the relocated and expanded Intensive Care Unit (ICU); tying into both the neighboring Medical Office Building and the existing hospital building. The second floor of the new Patient Care Center included 31 private Medical-Surgery rooms, and the third floor contained the relocated Adult Behavioral Health Inpatient Unit comprised of 20 private patient rooms.
From post-bid construction analysis through final punchlist completion, Landis worked diligently with our firm to build an exemplary new school, one which impressed the client enough to become the RSD’s prototype design for future elementary schools. Based on working with Landis Construction over several decades, I do not hesitate to highly recommend Landis for your upcoming construction projects.